Conceptual Artwork and Plans
Shown below are conceptual artwork and drawings of the Buidling Project. Please note that these were composed for the initial design, and some changes have been made in the final design.
View of exterior with new Band Room and Auditorium on the right
Overall Site Plan of both buildings showing re-location of the football field.
The bus garage location has been changed from what is shown to the opposite side of the parking lot.
1st Floor Plan of Middle/High School showing remodeled areas and new additions.
Cafeteria and main office areas are slightly different than that shown.
New Bus Garage - Slight changes were made in final design.